Project
MD Anderson Mid-Campus Building 1 Tenant Buildout
The Mid-Campus Building project comprises eight levels of interior build out. MLN Fire Protection installed a wet pipe sprinkler system in office and laboratory spaces. It was necessary to keep systems in service throughout construction with no interruption to the building occupants. System drain downs and the refilling of life safety systems required direct interface with the owner.
The overall project was 373,000 square feet of tenant renovations at an approximate contract amount of $900,000.
-
Work Performed
Fire Protection
-
Project Type
Healthcare
-
Location
Houston, Texas
-
Owner/Developer
MD Anderson Cancer Center
-
Architect
Morris Architects
-
Engineer
Shah Smith & Associates