Skip to content [s] Skip to section navigation [n] Site map [3] Home [1]

Project

Texas A&M, Mosher Hall

MLN Company was awarded the Mosher Hall HVAC Replacement project and will serve as the prime contractor on the project.  The project consists of a complete HVAC and Lighting upgrade and has a compressed construction schedule with 78 calendar days to complete the specified scope of work valued at $10+ million.  Work will be performed over the 2016 Christmas Break, 2017 Spring Break, and completed in the Summer of 2017.

  • Work Performed

    HVAC, MLN Sheet Metal, Fire Protection, Lighting, and all Architectural work.

  • Project Type

    Education & Research

  • Location

    College Station, Texas

  • Owner/Developer

    Texas A&M University, Residence Life a Division of Student Affairs

  • Engineer

    JonesDBR Engineering