Skip to content [s] Skip to section navigation [n] Site map [3] Home [1]

Project

Methodist Woodlands Hospital

MLN is proud to be part of a first-of-its-kind project in the healthcare market, the construction of the new Methodist Woodlands hospital campus; which is utilizing an innovative design-assist pre-construction/construction model which allows Vaughn Construction to select the key specialty subcontractors—like MLN—prior to 100% completion of construction documents.

Design-assist is a rising project delivery method in which the construction team is engaged by the owner to collaborate with the architect or engineer during the design phase. The (successful!) intent is to reduce the cost and time for construction, improve constructability and add value. Design assist is part of the recent trend in delivery methods toward teamwork approaches to design and construction.

MLN will provide HVAC, plumbing and fire protection services for the project.

The $328 million, 470,000 square foot campus will feature 93 hospital beds and a 390-bed inpatient tower, and completion is expected in 2017. The new hospital, which will be the eighth in the Houston Methodist system, will offer The Woodlands community a full service, acute care hospital capable of delivering services similar to what is available in the Texas Medical Center.

  • Work Performed

    HVAC, Plumbing and Fire Protection Services

  • Project Type

    Healthcare

  • Location

    The Woodlands, TX

  • Architect

    Page Southerland Page

  • Engineer

    S.S.R.