Skip to content [s] Skip to section navigation [n] Site map [3] Home [1]

Project

Houston Methodist West Campus

The project consists of a six-level, 228,700 SF hospital tower, expansion of the existing central plant, and a new parking structure, along with associated site development. Construction will be complete by September 2018.

  • Work Performed

    HVAC and Fire Protection Services

  • Project Type

    Healthcare

  • Location

    Houston, Texas

  • Owner/Developer

    Houston Methodist

  • Architect

    Page Southerland Page

  • Engineer

    Smith Seckman Reid